Mechanical and Electrical Detailed Design of 4 WWTPs

  • Location: WWTP Kochani, WWTP Strumica, WWTP Kichevo and WWTP Radovish, North Macedonia
  • Client: WTE/UVE/DIPKO
  • LOD: 400
  • Building Type: New Waste Water Treatment Plants
  • Software used: AutoCAD, REVIT
  • Design Year: 2017/2018  

Preparation of Preliminary and Detailed design for the Mechanical and Electrical works of the WWTP in Kochani, Kichevo, Strumica, and Radovish, and preparation of as-built design for the contractor for each WWTP.

Construction of WWTP Kochani for 65,000 PE with SBR technology, anaerobic digestion and thermal drying of the sludge.  Client is UWE and DIPKO from Macedonia. Construction cost 15 M CHF. Project financed by SECO

Construction of WWTP Kichevo for 48,000 PE with active sludge treatment with simultaneous denitrification and aerobic sludge stabilization. Client is UWE and DIPKO from Macedonia. Construction cost 7 M Euro. Project financed by EU.

Construction of WWTP Strumica for 56,000 PE with active sludge treatment with simultaneous denitrification and aerobic sludge stabilization. Client is UWE and DIPKO from Macedonia. Construction cost 8 M Euro. Project financed by EU.

Construction of WWTP Radovish for 28,000 PE with SBR technology and aerobic sludge stabilization. Client is UWE and DIPKO from Macedonia. Construction cost 5 M Euro. Project financed by EU.